Posts tagged with "commissioning"



IMO Commissioning test roadmap
15.04.2021
In November 2020 IMO MEPC 75 released the revised guidance BWM.2/Circ.70 Rev.1 with some new details for commissioning testing. What is the difference to the previous guidance?

27.11.2019
Ankron is performing a survey with various indicative tools. This time Hach BW 680 was tested.

02.05.2019
Ankron Water Services is performing a survey with various indicative tools. This time Turner Designs Ballast-Check 2 was tested.